/ EV Fleet Infrastructure

Fleet electrification starts with infrastructure, not vehicles.

EVGO scopes charging topology, grid load, and route coverage before deployment begins. No vehicles ordered until the infrastructure is verified.

Close-up ground-level view of a heavy-duty EV truck being connected to a DC fast charger at a logistics depot, cable and connector in sharp focus in the foreground, fleet of identical vehicles blurred in the background, daylight, visible concrete apron
Close-up ground-level view of a heavy-duty EV truck being connected to a DC fast charger at a logistics depot, cable and connector in sharp focus in the foreground, fleet of identical vehicles blurred in the background, daylight, visible concrete apron
— Deployment Scope

Infrastructure first. Vehicles second.

Charging Topology
Vehicle Fleet Matching
Grid Load Management

Site survey, load calculation, and charger placement mapped against route cycles before any hardware is specified or ordered.

Vehicle specification matched to route distance, payload class, and grid capacity — not to a catalog default.

Demand scheduling and grid draw profiling prevent infrastructure overload during peak fleet charging windows.

▸ Project Execution

Three phases. Defined criteria at each gate.

Phase 01 / Scope
Phase 02 / Deploy
Phase 03 / Support

Site audit and topology design

Hardware installation and fleet commissioning

Ongoing SLA and route coverage logging

Grid capacity verified, charger positions mapped, route data analyzed. Acceptance criteria documented before Phase 02 begins.

Chargers installed, vehicles commissioned, and kWh throughput validated against the baseline recorded in Phase 01.

Uptime SLAs defined at contract. Route coverage and kWh delivery logged monthly, not self-reported against vague targets.

Ready to scope your fleet deployment?

Bring your route data and fleet size. EVGO will map the infrastructure before you commit to a single vehicle.