Fleet electrification starts with infrastructure, not vehicles.
EVGO scopes charging topology, grid load, and route coverage before deployment begins. No vehicles ordered until the infrastructure is verified.


Infrastructure first. Vehicles second.
Site survey, load calculation, and charger placement mapped against route cycles before any hardware is specified or ordered.
Vehicle specification matched to route distance, payload class, and grid capacity — not to a catalog default.
Demand scheduling and grid draw profiling prevent infrastructure overload during peak fleet charging windows.
Three phases. Defined criteria at each gate.
Site audit and topology design
Hardware installation and fleet commissioning
Ongoing SLA and route coverage logging
Grid capacity verified, charger positions mapped, route data analyzed. Acceptance criteria documented before Phase 02 begins.
Chargers installed, vehicles commissioned, and kWh throughput validated against the baseline recorded in Phase 01.
Uptime SLAs defined at contract. Route coverage and kWh delivery logged monthly, not self-reported against vague targets.
Ready to scope your fleet deployment?
Bring your route data and fleet size. EVGO will map the infrastructure before you commit to a single vehicle.